Mold rack is a kind of rack, abbreviated as die rack. Mainly store a variety of mold items, according to the requirements of loading capacity can be divided into light mold shelves and heavy mold shelves. The top of the shelf can be equipped with a mobile hoist truck to facilitate the lifting of the mould. The die rack is made up of pillars and pull rods. The guide groove is installed on the pillars. The upper and lower parts are connected and fixed by crossbeams. Then the drawer tray is installed in the guide groove. The limit pin and guide rail are upper, and the roof is laid at last. Four kinds of surface treatment schemes commonly used in mould shelves are spray painting, plastic spraying, hot galvanizing and cold galvanizing. The price drop also means the quality drop, but is it absolute? We can find some good reputation mold shelf manufacturers to customize, so safe and assured that our company has a professional installation and transportation team to ensure that there will be no problems in the installation process; moreover, we have a complete set of procedures, attached with the mold shelf safety operation instructions, to ensure the safety of the use stage.
Mold shelf production process:
Light-duty die rack uses 100# channel steel as special column, which is made of high quality Q235 strip rolled by rolling mill at one time.
Drawer disc frames are usually welded with rectangular tubes and 4.0 bending parts to form overlay steel plates. The guide groove is formed by bending 4.0 steel plate. The top and bottom are connected by crossbeams, and the top is covered with roofs. The roof can store articles.
Heavy-duty die rack uses heavy-duty rack as the whole frame, and installs guide rails and drawer pans on the rack pillars. Generally, no less than 90 x 70 columns are required.
The die rack is made up of pillars and pull rods. The guide groove is installed on the pillars. The upper and lower parts are connected and fixed by crossbeams. Then the drawer tray is installed in the guide groove. The limit pin and guide rail are upper, and the roof is laid at last.
If there is no traveling crane in the factory building, skyscrapers and cranes can also be erected on the shelf posts, and manual or electric hoists can be installed. Skyscrapers shall be welded with beams not less than 100 x 50.
After blackembryo is finished, the whole parts can be packaged and shipped by shot peening, oil removal, rust removal and the last surface treatment process of plastic spraying.