heyzo高清中文字幕在线,2019一本久道在线线观看草留视频,2020亚洲欧美日韩国产精品

Welcome to Wuhu Kejie Intelligent Storage Equipemnt Manufacture Co.,LTD. website! 180-5535-2219

Products

科杰智能倉儲設備是一家致力于提供智能倉儲物流設備解決方案的企業。

科杰智能倉儲設備是一家致力于提供智能倉儲物流設備解決方案的企業。

Mold shelf

608
2018-06-05

Mold rack is a kind of rack, abbreviated as die rack. Mainly store a variety of mold items, according to the requirements of loading capacity can be divided into light mold shelves and heavy mold shelves. The top of the shelf can be equipped with a mobile hoist truck to facilitate the lifting of the mould. The die rack is made up of pillars and pull rods. The guide groove is installed on the pillars. The upper and lower parts are connected and fixed by crossbeams. Then the drawer tray is installed in the guide groove. The limit pin and guide rail are upper, and the roof is laid at last. Four kinds of surface treatment schemes commonly used in mould shelves are spray painting, plastic spraying, hot galvanizing and cold galvanizing. The price drop also means the quality drop, but is it absolute? We can find some good reputation mold shelf manufacturers to customize, so safe and assured that our company has a professional installation and transportation team to ensure that there will be no problems in the installation process; moreover, we have a complete set of procedures, attached with the mold shelf safety operation instructions, to ensure the safety of the use stage.

模具貨架

Mold shelf production process:

Light-duty die rack uses 100# channel steel as special column, which is made of high quality Q235 strip rolled by rolling mill at one time.
Drawer disc frames are usually welded with rectangular tubes and 4.0 bending parts to form overlay steel plates. The guide groove is formed by bending 4.0 steel plate. The top and bottom are connected by crossbeams, and the top is covered with roofs. The roof can store articles.
Heavy-duty die rack uses heavy-duty rack as the whole frame, and installs guide rails and drawer pans on the rack pillars. Generally, no less than 90 x 70 columns are required.
The die rack is made up of pillars and pull rods. The guide groove is installed on the pillars. The upper and lower parts are connected and fixed by crossbeams. Then the drawer tray is installed in the guide groove. The limit pin and guide rail are upper, and the roof is laid at last.
If there is no traveling crane in the factory building, skyscrapers and cranes can also be erected on the shelf posts, and manual or electric hoists can be installed. Skyscrapers shall be welded with beams not less than 100 x 50.
After blackembryo is finished, the whole parts can be packaged and shipped by shot peening, oil removal, rust removal and the last surface treatment process of plastic spraying.

QQ
Tel
Hotline:
180-5535-2219
WeChat
WeChat
TOP
  • <menu id="9rhqs"><tbody id="9rhqs"><cite id="9rhqs"></cite></tbody></menu>
    
    

      <menuitem id="9rhqs"><center id="9rhqs"></center></menuitem>
      主站蜘蛛池模板: 沈丘县| 奉贤区| 遂宁市| 中宁县| 福泉市| 固原市| 株洲市| 井冈山市| 齐河县| 壶关县| 罗江县| 仁寿县| 苏尼特左旗| 高密市| 师宗县| 平乡县| 芷江| 宁城县| 垣曲县| 哈巴河县| 米泉市| 清水县| 中江县| 镇安县| 云霄县| 武宣县| 博客| 本溪市| 兰州市| 陇川县| 黄龙县| 巩留县| 乡宁县| 司法| 东台市| 黑龙江省| 漳平市| 勐海县| 蛟河市| 汉川市| 霍林郭勒市|